How Much Does It Cost?

Concrete and cement calculator

For small DIY jobs (a base, a pad, a fence post) this tool calculates concrete volume and breaks the mix down into cement, sand, gravel and water. It does not replace an engineer’s design for structural elements.

Home improvement Updated:

Inputs

m
m
cm
%

Volume ratio cement : sand : gravel. 1:2:3 is a common general-purpose mix; always follow your engineer’s specification.

Dry materials occupy more volume than the finished concrete because water and cement fill the voids. 1.54 is the classic textbook factor.

kg/m³
kg
$

Starting values are editable examples, not official prices. Results update automatically as you change the inputs.

Result

Concrete volume

1.26 m³

Cement bags
19 units
Cement
465.7 kg
Sand
0.647 m³
Gravel
0.97 m³
Approximate water
232.85 L
Dry materials by volume
Cement: 0.323 m³Sand: 0.647 m³Gravel: 0.97 m³Total1.94
  • Cement0.323 m³ · 16.7%
  • Sand0.647 m³ · 33.3%
  • Gravel0.97 m³ · 50%
Calculation breakdown
  1. Volume of each element = 1.2 m³
  2. Total volume with allowance = 1.2 m³ × 1 × (1 + allowance) = 1.26 m³
  3. Dry volume = 1.26 m³ × factor = 1.94 m³
  4. Cement = dry volume × (cement parts ÷ total parts) × density = 465.7 kg
  5. Bags = 465.7 kg ÷ bag weight = 19
  6. Water = cement × w/c ratio = 232.85 L

Indicative result based on the data you entered. It does not replace a professional quote or your actual bill.

How it is calculated

Volume: slab = length × width × thickness; column = π × (diameter ÷ 2)² × height; multiplied by count and allowance.

Dry volume = volume × 1.54. Each material = dry volume × its parts ÷ total parts. Cement mass = its volume × bulk density (≈1,440 kg/m³ or 90 lb/ft³). Water = cement × water/cement ratio.

Worked example

Using the calculator’s example values:

  • Element type: Slab, base or footing (rectangular)
  • Length: 4 m
  • Width: 3 m
  • Thickness: 10 cm
  • Number of identical elements: 1
  • Waste allowance: 5%
  • Mix: parts cement: 1
  • Parts sand: 2
  • Parts gravel: 3
  • Dry volume factor: 1.54
  • Cement bulk density: 1,440 kg/m³
  • Cement bag weight: 25 kg
  • Water/cement ratio: 0.5
  • Price per bag (optional): $0.00

Result: Concrete volume — 1.26 m³ (cement bags: 19 units; cement: 465.7 kg; sand: 0.647 m³).

Money-saving tips

  • For large volumes ready-mix is usually worth it.
  • Don’t add extra water: it reduces strength.
  • Cure the concrete by keeping it moist for the first days.

Frequently asked questions

Which mix ratio should I use?

It depends on the use. 1:2:3 is a common general-purpose DIY mix, but for foundations or structural elements follow the engineer’s specification.

Why multiply by 1.54?

Because when mixed, cement and water fill the gaps between aggregates; you need more dry volume than the finished concrete.

Does it work for pre-mixed bagged concrete?

Use the calculated volume and the yield stated on the pre-mixed bag (volume per bag).

How we calculate and the limits of the results: Methodology.